W56358900VE
V-Gard vapour control membrane
Self-adhesive vapour control layer: reinforced aluminium foil with a bitumen adhesive layer.
490,14 €
HomeVapour controlSA-19 Primer

Elevate · Vapour control
Primer under the V-Gard self-adhesive vapour control layer.
| Coverage, porous substrate | 3–4 m²/l |
|---|---|
| Coverage, non-porous substrate | 5–10 m²/l |
| Temperature | +5…+45 °C, in dry weather |
| Storage | 15–25 °C, min. 12 months |
Concrete and steel deck before bonding V-Gard.
Installation tips — EPDM buyer’s guide. Data: Elevate technical data sheets (EU).
| W563587190 | 5 l pail | 80,44 € |
| W563587191 | 15 l pail | 219,37 € |
Self-adhesive vapour control layer: reinforced aluminium foil with a bitumen adhesive layer.